What is the typical Kitchen Renovation process.
1. Ceate A kitchen design with the intial measure.
2. Select materials (Eco-Friendly) .
3. Plan Check your design.
4. Order Materials.
5. Deliver materials.
6. Demolition.
7. Sub Flooring preperations.
8. Flooring Installation.
9. Plumbing.
10. Electric.
11. Wall preparations.
12. Priming and painting/Wall paper.
13. Locating Appliances and verifying Specs.
14. Cabinet Installations.
15. Counter top template with Sink and faucets on Job site.
16. Countertop fabrications verifying estimated install date.
17, Countertop Installation.
18. Sink and faucet installation.
19. Appliance installation.
20. Backsplash installation.
21. Light fixture installation.
22. Accessories Installations.
23. Door and draw hardware installation.
24. Final coat of paint.
25. Touch up items.
